{"id":608,"date":"2018-05-07T20:58:07","date_gmt":"2018-05-07T20:58:07","guid":{"rendered":"https:\/\/brownsburgsentinel.com\/site\/?p=608"},"modified":"2018-05-18T16:26:36","modified_gmt":"2018-05-18T16:26:36","slug":"update-may-21st-green-street-hwy-267-street-closures","status":"publish","type":"post","link":"https:\/\/brownsburgsentinel.com\/site\/2018\/05\/07\/update-may-21st-green-street-hwy-267-street-closures\/","title":{"rendered":"UPDATE II &#8211; May 29th &#8211; Green Street (Hwy 267) Street Closures"},"content":{"rendered":"<div id=\"fb-root\"><\/div>\n<h5><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-432 size-full\" src=\"https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/map.jpg\" alt=\"\" width=\"960\" height=\"753\" srcset=\"https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/map.jpg 960w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/map-300x235.jpg 300w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/map-768x602.jpg 768w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/map-696x546.jpg 696w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/map-535x420.jpg 535w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><\/h5>\n<h6><strong>UPDATE 10:45am 05\/16\/2018<\/strong><br \/>\nConstruction on the redesign rescheduled to begin on\u00a0<strong>May 29th<\/strong>. Both lanes of the road will be closed to traffic north of Lucas Drive to 56th Street through 4th quarter 2018.<\/h6>\n<h6><strong>UPDATE 4:45pm 05\/07\/2018<\/strong><br \/>\nConstruction on the redesign begins <strong>May 21<\/strong>. Both lanes of the road will be closed to traffic north of Lucas Drive to 56th Street through 4th quarter 2018.<\/h6>\n<h6>N. Green south of Lucas Drive will be open to both northbound and southbound traffic. Lucas Drive will be open to Arbuckle Acres park visitors. Motorists are urged to use Northfield Drive to detour the construction zone.<\/h6>\n<blockquote class=\"td_quote_box td_box_left\">\n<h3>Green Street redesign begins <strong>May 21,\u00a0<\/strong>road will be closed to traffic north of Lucas Drive (entrance Arbuckle Acres) to 56th Street through 4th quarter 2018.<\/h3>\n<\/blockquote>\n<h6>The redesign of the town&#8217;s primary north\/south arterial will add a dedicated left-turn lane, sidewalks and bike lanes. The $6.1 million project is 52 percent federally-funded through the Highway Safety Improvement Program.<\/h6>\n<h6>Additional infrastructure improvements underway include the construction of a new centrally-located Arbuckle Acres entrance, the extension of Enderly Avenue and Mill Street, and the installation of a new stoplight at 56th and Grant streets. See map above for suggested detours.<\/h6>\n<h6>&#8211;\u00a0<i>&#8212; Town of Brownsburg Press Release<\/i><\/h6>\n","protected":false},"excerpt":{"rendered":"<p>UPDATE 10:45am 05\/16\/2018 Construction on the redesign rescheduled to begin on\u00a0May 29th. Both lanes of the road will be closed to traffic north of Lucas Drive to 56th Street through 4th quarter 2018. UPDATE 4:45pm 05\/07\/2018 Construction on the redesign begins May 21. Both lanes of the road will be closed to traffic north of [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":432,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[29,1,30],"tags":[],"class_list":["post-608","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-general-interest","category-latest-news"],"_links":{"self":[{"href":"https:\/\/brownsburgsentinel.com\/site\/wp-json\/wp\/v2\/posts\/608"}],"collection":[{"href":"https:\/\/brownsburgsentinel.com\/site\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/brownsburgsentinel.com\/site\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/brownsburgsentinel.com\/site\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/brownsburgsentinel.com\/site\/wp-json\/wp\/v2\/comments?post=608"}],"version-history":[{"count":6,"href":"https:\/\/brownsburgsentinel.com\/site\/wp-json\/wp\/v2\/posts\/608\/revisions"}],"predecessor-version":[{"id":705,"href":"https:\/\/brownsburgsentinel.com\/site\/wp-json\/wp\/v2\/posts\/608\/revisions\/705"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/brownsburgsentinel.com\/site\/wp-json\/wp\/v2\/media\/432"}],"wp:attachment":[{"href":"https:\/\/brownsburgsentinel.com\/site\/wp-json\/wp\/v2\/media?parent=608"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/brownsburgsentinel.com\/site\/wp-json\/wp\/v2\/categories?post=608"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/brownsburgsentinel.com\/site\/wp-json\/wp\/v2\/tags?post=608"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}