{"id":26736,"date":"2023-05-16T21:07:18","date_gmt":"2023-05-16T21:07:18","guid":{"rendered":"https:\/\/brownsburgsentinel.com\/site\/?p=26736"},"modified":"2023-06-08T02:41:53","modified_gmt":"2023-06-08T02:41:53","slug":"ronald-reagan-parkway-expansion-road-closures-announced","status":"publish","type":"post","link":"https:\/\/brownsburgsentinel.com\/site\/2023\/05\/16\/ronald-reagan-parkway-expansion-road-closures-announced\/","title":{"rendered":"Ronald Reagan Parkway Expansion &#038; Road Closures Announced"},"content":{"rendered":"<div id=\"fb-root\"><\/div>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-26740\" src=\"https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Hendricks-County-Indiana-Seal-Transparent.png\" alt=\"\" width=\"920\" height=\"482\" srcset=\"https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Hendricks-County-Indiana-Seal-Transparent.png 920w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Hendricks-County-Indiana-Seal-Transparent-300x157.png 300w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Hendricks-County-Indiana-Seal-Transparent-768x402.png 768w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Hendricks-County-Indiana-Seal-Transparent-696x365.png 696w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Hendricks-County-Indiana-Seal-Transparent-802x420.png 802w\" sizes=\"(max-width: 920px) 100vw, 920px\" \/>Hendricks County, with funding from the Federal Highway Administration (FHWA) and administrative oversight from the Indiana Department of Transportation (INDOT), will proceed with the Ronald Reagan Parkway Extension project. Phase 1A of this project will extend the parkway on new alignment from CR 600 N to CR 750 N (see below). The project was awarded for construction March 2023.&nbsp; Construction scheduled to begin Spring of 2023 and end in 2024. The project cost is nearly 38 mil dollars.<br \/>\n&nbsp;<br \/>\nThe project is a new roadway consisting of:<br \/>\n\u2022 Approx 1.6 miles in length<br \/>\n\u2022 (4) 12 foot wide travel lanes<br \/>\n\u2022 (1) 16 foot center median \/ turn lane<br \/>\n\u2022 (2) Retention Ponds<br \/>\n\u2022 (1) 10 foot Multi-Use path located on the east side of the parkway&nbsp;<br \/>\n\u2022 (1) CSX Railway Over Pass approx. .2 miles south of intersection with CR 700N<br \/>\n\u2022 Shoulders, curbs, gutters along the entire route as needed<br \/>\n\u2022 Modifications to existing roadways as needed<br \/>\n\u2022 CR 900 E. will be closed permanently from CR 600 N. to CR 750 N May 23rd<br \/>\n&nbsp;<\/p>\n<figure id=\"attachment_26738\" aria-describedby=\"caption-attachment-26738\" style=\"width: 696px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-26738 size-large\" src=\"https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Extension-1024x455.jpg\" alt=\"\" width=\"696\" height=\"309\" srcset=\"https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Extension-1024x455.jpg 1024w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Extension-300x133.jpg 300w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Extension-768x341.jpg 768w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Extension-1536x682.jpg 1536w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Extension-2048x909.jpg 2048w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Extension-696x309.jpg 696w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Extension-1068x474.jpg 1068w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Extension-946x420.jpg 946w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Extension-1920x852.jpg 1920w\" sizes=\"(max-width: 696px) 100vw, 696px\" \/><figcaption id=\"caption-attachment-26738\" class=\"wp-caption-text\">Reagan Parkway Extension from CR 600 N to CR 750 N<\/figcaption><\/figure>\n<p>As a result of the extension of the Reagan Parkway announcement beginning Tuesday, May 23, CR 900 E. will be closed permanently from CR 600 N. to CR 750 N (see below).<\/p>\n<figure id=\"attachment_26772\" aria-describedby=\"caption-attachment-26772\" style=\"width: 966px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-26772 size-full\" src=\"https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/CR-900E-Road-Closure-Update.png\" alt=\"\" width=\"966\" height=\"341\" srcset=\"https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/CR-900E-Road-Closure-Update.png 966w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/CR-900E-Road-Closure-Update-300x106.png 300w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/CR-900E-Road-Closure-Update-768x271.png 768w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/CR-900E-Road-Closure-Update-696x246.png 696w\" sizes=\"(max-width: 966px) 100vw, 966px\" \/><figcaption id=\"caption-attachment-26772\" class=\"wp-caption-text\">CR 900 East cul-de-sac locations<\/figcaption><\/figure>\n<p>The detour route, highlighted in orange on the map below, will follow N. Raceway Rd. to Maloney Rd. The red line depicts the road closure, and the purple line represents the future Ronald Reagan Parkway extension (see below).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-26737 size-large\" src=\"https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Extension-Detour-Route-1024x981.jpg\" alt=\"\" width=\"696\" height=\"667\" srcset=\"https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Extension-Detour-Route-1024x981.jpg 1024w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Extension-Detour-Route-300x287.jpg 300w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Extension-Detour-Route-768x736.jpg 768w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Extension-Detour-Route-1536x1472.jpg 1536w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Extension-Detour-Route-696x667.jpg 696w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Extension-Detour-Route-1068x1023.jpg 1068w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Extension-Detour-Route-438x420.jpg 438w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Extension-Detour-Route.jpg 1810w\" sizes=\"(max-width: 696px) 100vw, 696px\" \/><\/p>\n<p>Phase 1B is designed to extend the parkway from CR 750 N to CR 1000 N. During a public hearing held Wednesday, May 10th, John Ayers Hendricks County engineer stated that right-of-way access for Phase 1B has been secured (see below). This project provides for removing the dog leg section from Maloney Road. Funding for constructing Phase 1B is being sought, but there are no current plans for construction.&nbsp;&nbsp;<\/p>\n<figure id=\"attachment_26743\" aria-describedby=\"caption-attachment-26743\" style=\"width: 696px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-26743 size-large\" src=\"https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Exhibit-1b-1024x313.webp\" alt=\"\" width=\"696\" height=\"213\" srcset=\"https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Exhibit-1b-1024x313.webp 1024w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Exhibit-1b-300x92.webp 300w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Exhibit-1b-768x235.webp 768w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Exhibit-1b-1536x469.webp 1536w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Exhibit-1b-696x213.webp 696w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Exhibit-1b-1068x326.webp 1068w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Exhibit-1b-1375x420.webp 1375w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Reagan-Parkway-Exhibit-1b.webp 1679w\" sizes=\"(max-width: 696px) 100vw, 696px\" \/><figcaption id=\"caption-attachment-26743\" class=\"wp-caption-text\">Reagan Parkway Phase 1B CR 750 N to CR 1000 N. this phase NOT FUNDED at this time.<\/figcaption><\/figure>\n<p><strong>Public Comments are Open until June 9th, 2023<\/strong><\/p>\n<p>Public comments regarding the project remain open until June 9, 2023. They can be submitted online <span style=\"color: #0000ff;\"><a style=\"color: #0000ff;\" href=\"https:\/\/www.structurepointpublic.com\/ronaldreagan\" target=\"_blank\" rel=\"noopener\">&gt;&gt; CLICK HERE &lt;&lt; <\/a><\/span>scroll to the bottom of the page.<\/p>\n<p>Comments may also be mailed, faxed, or submitted via e-mail to the address\/fax number. The form is found at this link <span style=\"color: #0000ff;\"><a style=\"color: #0000ff;\" href=\"https:\/\/www.structurepointpublic.com\/_files\/ugd\/8ec4b1_1cde4b6c800547519e4ae5aad1388e48.pdf\" target=\"_blank\" rel=\"noopener\">&gt;&gt; CLICK HERE &lt;&lt;<\/a><\/span>.<\/p>\n<p>Contact information for the engineer overseeing the project:<br \/>\nScott Farrell<br \/>\nAmerican Structurepoint, Inc.<br \/>\n9025 River Road, Suite 200<br \/>\nIndianapolis, Indiana 46240<br \/>\nEmail: sfarrell@structurepoint.com<br \/>\nFax: (317) 543-0270<\/p>\n<p><strong>Additional Information Regarding the Project is Found At:<\/strong><\/p>\n<p>For additional information regarding the Ronald Reagan Parkway extension project, visit <span style=\"color: #0000ff;\"><a class=\"x1i10hfl xjbqb8w x6umtig x1b1mbwd xaqea5y xav7gou x9f619 x1ypdohk xt0psk2 xe8uvvx xdj266r x11i5rnm xat24cr x1mh8g0r xexx8yu x4uap5 x18d9i69 xkhd6sd x16tdsg8 x1hl2dhg xggy1nq x1a2a7pz xt0b8zv x1fey0fg\" style=\"color: #0000ff;\" tabindex=\"0\" role=\"link\" href=\"https:\/\/www.structurepointpublic.com\/ronaldreagan?fbclid=IwAR026f1x0t7dVE7gZLsDixmzMf1vWR8s0PIuUhy_o_H_DpKMcQjun2HoiC4\" target=\"_blank\" rel=\"nofollow noopener\">https:\/\/www.structurepointpublic.com\/ronaldreagan<\/a><\/span><\/p>\n<p>The link above contains an informative 16 minute video which thoroughly covers the project and addresses many frequently asked questions.<\/p>\n<p>Video Highlights<\/p>\n<p>Time&nbsp; &nbsp;Topic<br \/>\n00:50 Project Team Introductions<br \/>\n02:06 Project Overview and Phrase Breakdown<br \/>\n03:55 Phase 1a Details<br \/>\n04:22 Phase 1a CSX Bridge Detail<br \/>\n05:30 Phase 1a Existing Roadway Improvements Detail<br \/>\n06:05 Phase 1a Cnty Rd 900 Closure and Results<br \/>\n06:20 Phase 1a Drainage Plans<br \/>\n06:53 Phase 1b Details<br \/>\n07:18 Phase 1b FAQ Drainage Issues Addressed<br \/>\n07:55 Phase 1b Maloney Road Dog Leg Removal<br \/>\n08:37 Phase 1a Detour Route<br \/>\n09:32 Phase 1a FAQ Detour Traffic Impact Addressed<br \/>\n11:00 Phase 1a National Environmental Policy Act (NEPA)<br \/>\n14:05 Phase 1a Environmental Process &#8211; Noise Impact Study<\/p>\n<hr>\n<h5><strong>Please check have you received an invite to \u201cLIKE\u201d the Brownsburg Sentinel ?<\/strong><\/h5>\n<p><strong>Do you like our content?&nbsp; Please help us Grow!<\/strong><\/p>\n<p id=\"attachment_4318\" class=\"wp-caption aligncenter\" aria-describedby=\"caption-attachment-4318\"><a href=\"https:\/\/www.facebook.com\/brownsburgsentinel\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-4318 size-full td-animation-stack-type0-2\" src=\"https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Facebook-Like-Icon.png\" sizes=\"(max-width: 476px) 100vw, 476px\" srcset=\"https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Facebook-Like-Icon.png 476w, https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/Facebook-Like-Icon-300x93.png 300w\" alt=\"\" width=\"476\" height=\"147\"><\/a>Click on the LOGO. GOTO Facebook and \u201cLIKE\u201d our Page! Thank You!<\/p>\n<hr>\n<p>Content via:<br \/>\nAmerican Structurepoint<br \/>\nThe Editor<\/p>\n<p>Contact information for the engineer overseeing the project:<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-26750 alignleft\" src=\"https:\/\/brownsburgsentinel.com\/site\/wp-content\/uploads\/American-StructurePoint-Logo.jpg\" alt=\"\" width=\"247\" height=\"120\">Scott Farrell<br \/>\nAmerican Structurepoint, Inc.<br \/>\n9025 River Road, Suite 200<br \/>\nIndianapolis, Indiana 46240<br \/>\nEmail: sfarrell@structurepoint.com<br \/>\nFax: (317) 543-0270<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hendricks County, with funding from the Federal Highway Administration (FHWA) and administrative oversight from the Indiana Department of Transportation (INDOT), will proceed with the Ronald Reagan Parkway Extension project. Phase 1A of this project will extend the parkway on new alignment from CR 600 N to CR 750 N (see below). The project was awarded [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":26752,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[29,1,36,30],"tags":[],"class_list":["post-26736","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-general-interest","category-hendricks-county","category-latest-news"],"_links":{"self":[{"href":"https:\/\/brownsburgsentinel.com\/site\/wp-json\/wp\/v2\/posts\/26736"}],"collection":[{"href":"https:\/\/brownsburgsentinel.com\/site\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/brownsburgsentinel.com\/site\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/brownsburgsentinel.com\/site\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/brownsburgsentinel.com\/site\/wp-json\/wp\/v2\/comments?post=26736"}],"version-history":[{"count":24,"href":"https:\/\/brownsburgsentinel.com\/site\/wp-json\/wp\/v2\/posts\/26736\/revisions"}],"predecessor-version":[{"id":26775,"href":"https:\/\/brownsburgsentinel.com\/site\/wp-json\/wp\/v2\/posts\/26736\/revisions\/26775"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/brownsburgsentinel.com\/site\/wp-json\/wp\/v2\/media\/26752"}],"wp:attachment":[{"href":"https:\/\/brownsburgsentinel.com\/site\/wp-json\/wp\/v2\/media?parent=26736"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/brownsburgsentinel.com\/site\/wp-json\/wp\/v2\/categories?post=26736"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/brownsburgsentinel.com\/site\/wp-json\/wp\/v2\/tags?post=26736"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}